Standard Equipment:
-
- Generator Demand Priority Control
-
- Automatically match the on-line generator capacity to the loads, and avoid unnecessary operation of generator sets.
Optional Equipment:
-
- Data Table Interface
-
- Accommodates interface with a building management system for monitoring all system parameters via Modbus RTU or TCP
-
- Supplemental Hardware Synchronization Check Relay (ansi 25 Device)
-
- Provides additional discrete synchronization protection
-
- Remote Power Monitoring System
-
- To monitor breaker status, alarms, metering and other operating parameters